Southmead is a popular school serving a diverse community in South London. An existing tarmacadam pathway was holding water and restricting play in wet weather. Redlynch Lesiure removed the tarmacadam and installed new stone drainage which was covered over with our FlexiPath porous pathway solution -a free draining sustainable drainage solution (SuDS). The new playground surface will provide years of use with minimal maintenance.

FlexiPath